The project is aimed at the safe operation of the Khandiza tailing dump
The main directions of the working project for us are:
- tailings storage analysis;
- promising structures of the hydraulic transport system and hydraulic tailings;
- water balance of the tailing dump;
- a tailings storage scheme has been developed;
- the prospect of operating a tailings
- storage facility is promising construction work;
- monitoring of the operation of the tailings storage facility;
- environmental protection.