Development of Working Documentation (WD) for the object “Construction of Boisun GPP. Water supply. Second (Reserve) source.

Development of Working Documentation (WD) for the object “Construction of Boisun GPP. Water supply. Second (Reserve) source.

Boisun gas processing plant is a complex engineering complex for processing 5 billion m3/year of natural gas produced at the «Mustakillikning 25 yilligi» gas field located in Surkhandarya region of the Republic of Uzbekistan.

The project provides for the performance of all types of work, both temporary and permanent, necessary for the implementation of the project, including design, development of working documentation, in accordance with regulatory documents; the introduction of advanced and progressive technologies; the use of highly efficient mechanical, pumping and other equipment; ensuring industrial, fire and environmental safety.

A backup water supply system from the Sherabad Main Canal (SMC) was envisaged for uninterrupted operation of the plant.

The scope of work of ALTERRA TEAMS LLC for this project included the development of detailed design of  cross regulator on the Sherabad main canal with a capacity of 150 m3/sec.