The purpose of the project is to relocate the tubular collector running through the construction site in order to ensure a minimum distance of 10 meters from the collector axis to the buildings under construction.
Services provided by Alterra:
- Development of the working project, including drawings and explanatory note.
- Development of cost estimate documentation.