Project Objective
Ensuring the reliable, safe, and efficient operation of the Uch-Kurgan Hydroelectric Complex through the implementation of modern technological solutions and their supervision at all stages of reconstruction.
Completed Tasks
-
Conducted engineering surveys and performed a comprehensive analysis of the current condition of hydraulic structures;
-
Developed specialized technological solutions aimed at enhancing the stability, efficiency, and safety of the hydro complex;
-
Prepared project documentation in compliance with national and international standards;
-
Provided author’s supervision during the implementation of project solutions throughout the reconstruction stage;
-
Introduced innovative engineering solutions to increase the capacity and durability of the hydro complex.
Project Significance
As a result of the reconstruction:
-
The reliability of the region’s hydropower infrastructure has been strengthened;
-
Power generation has increased through modernization of equipment;
-
Water use and flow regulation have been optimized;
-
Protection against potential hydrodynamic risks has been enhanced;
-
A significant contribution has been made to the sustainable socio-economic development of the Namangan region.
Achieved Results
-
The developed and implemented technological solutions have been tested and proven effective during reconstruction;
-
Continuous author’s supervision and control over the implementation of project solutions were ensured at all stages;
-
The operational efficiency of the hydro complex has been improved;
-
The service life of hydraulic structures and equipment has been extended.